The total cost objective function is constructed by summing the variable production costs and the fixed setup costs. Variable costs are calculated by multiplying the unit variable cost of each machine by the number of units produced on that machine (XiX_i).

Conditions: There are multiple machines with distinct variable and fixed costs.; XiX_i represents the continuous production quantity on machine ii.; YiY_i represents the binary activation status of machine ii.; The goal is cost minimization.

Find a method

↗

In Least Cost Branch and Bound, the algorithm selects the node with the minimum cost from the available nodes to explore next. This prioritizes paths that appear most promising based on the current cost evaluation.

Conditions: Applicable when using the Least Cost strategy for Branch and Bound.; A cost function is defined for the problem.

Understand why

↗

An equality constraint is used because the customer order requires exactly 1000 units to be supplied. The problem specifies that the order must be met precisely, meaning neither underproduction (shortfall) nor overproduction (surplus) is permitted.

Conditions: The problem involves fulfilling a specific customer order.; The order quantity is fixed and must be met exactly.; Overproduction or underproduction is not allowed or desired.

Understand why

↗

Capacity constraints must be linked to binary variables to ensure logical consistency between machine activation and production. Simple capacity limits (Xi≤CiX_i \le C_i) allow production even if the machine is not activated (Yi=0Y_i=0), which would incur variable costs without paying the fixed setup cost.

Conditions: Machines have fixed setup costs.; Production is bounded by machine capacity.; Binary variables indicate machine activation.; The model must prevent production on inactive machines.